OUR RECENT MAJOR PROJECTS IN OIL & GAS

YAMAMA FORMATION DEVELOPMENT WEST QUERNA 2 PROJECT(CONCEPT OPTIMIZATION) - 

Completed the concept optimization study for gas plant comprising AGR, GDU, Hydrocarbon Dewpoint Unit, NGL extraction, LPG and SRU/AGI.

FLARE SYSTEM IMPROVEMENT PROJECT(DETAILED DESIGN) -

Elixir is currently executing the detail engineering scope for the improvement of flare system for NATPET, Saudi Arabia. Which mainly involves flare system adequacy check. 

DESIGN ENGINEERING FOR BU HASA SWAG CO2 EOR PILOT PROJECT - 

Elixir is currently involved in Process Engineering & Assurance support for BU HASA SWAG Pilot project where in dense phase CO2 transportation & injection is involved.

HYDROGEN PROJECTS

  1. Hydrogen generation, compression, storage & dispensation facilities for Australian client.
  2. Hydrogen vent study for Australian client.
  3. Concept for Hydrogen blending with natural gas for Indian client.

FLOW ASSURANCE STUDIES

Flow Assurance study of Subsea field in North Sea for Converting gas injector into producers with initial production from gas cap and subsequent oil production with low temperature study and safeguarding review.

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

AMINE SWAP OUT STUDY

We are very much delighted and proud of our team for securing one more very special study from North Sea Operator UK. The Amine Swap Out Study for Buzzard Platform is very critical for the sustained oil production and very careful examination is required to select alternative solvent. Elixir has a team of professionals who are highly experienced in this area and confident to deliver the exact solution.

ONGOING PROJECT

  • Vertical Flare System Modelling – Beach Energy Beharra Springs ER & PO Project, AUSTRALIA.
  • Stress Analysis – Additional Membrane Tie In Pipe Stressing Analysis, AUSTRALIA.
  • Instrumentation Panel Modification Detail Design for – Repsol – Claymore – SCAPA/CASWI HPU Upgrade, UK.
  • Structural Piperack Modification for DANA Tritan repair & replacement of perforated areas Work, UK.
  • HAZID, DR, HAZOP Facilitation- OQ, OMAN.
  • Flare System Modification Work, NATPET, SAUDI ARABIA.

COMPLETED PROJECTS

  • NWB6 Production Facilities – Flow line Transient Analysis, UK.
  • QRA study for Pride Packaging project, OQ, OMAN.
  • HAZOP Facilitation for Glycol Debottlenecking System, UK.
  • Claymore Sidetrack and Workover Well C58 – Slugging Analysis (In OLGA), UK.
  • As Building of Catalytic Point Gas Detectors Work pack 8 and 10- Instrumentation upgrade, UK.
  • Replace Local Deck Plating- Structural Modification scope for replacing Kennedy gratings, UK.
  • Design Review Facilitation for Fire Network modifications, Orpic, OMAN.
  • Claymore – Oil Export – Pump Outages Post SD Pipework Replace- Instrumentation Detailed Design, UK.
  • Shell Gannet DGS – N2 Seals Dispersion Study, UK.
  • HAZOP Facilitation for recovered oil from drain re-routing, UK.
  • HAZOP Facilitation for Test separator divertor valve modifications, UK.
  • Armada Destec Seal ring Replacement NWS & Maria –  Piping Drawings, Civil Support Drawings & Load data Preparation, UK.
  • Sand Transport modelling in subsea well to Offshore Platform.
  • Water hammer effect study for BW offshore PW injection system
  • DP6 DP8 pipeline Transient Analysis for Spirit Energy.
  • FG Import -Low Temperature study (Riser ESDV opening) for Spirit Energy.
  • Minimum Temp Analysis for FG Import Scrubber during platform startup –Spirit Energy
  • Transient simulation for N16, N7 and BK8 wells for Apache
  • Slug prediction and impact of the slug on pipeline/piping configuration for Iona-3 pipeline for Lochard Facility in Australia
  • Fire Water network hydraulic study (steady state as well as transient) for UK client.
  • Process support for finalizing the concept of flare gas recovery facility for Oman client through Norwegian EPC company.